Alif Group RMG Factory Masterplan — industrial architecture project by REINCARNATION, Gazipur

Alif Group RMG Factory Masterplan

Design Completed
Year 2013
Location Gazipur
Type Industrial · Architecture
Area 185,458 sft
Services Architecture, Landscape

A ready-made garment factory for Alif Group, master planned around one 355-foot production shed — with a water body held open at the site's centre and everything else pushed to its edges.

The challenge

A garment factory has to move fabric from unloading to dispatch without pause, while housing the canteen, medical centre, daycare and warehousing its workforce needs on the same plot.

The approach

One long production block is kept clear of everything else, with loading held to a single yard on its flank and the store, warehouse, daycare and medical centre run in a separate wing across the water. Brick walls and lime-green steel frames carry a glazed office at the head, with a roof garden, meeting room and helipad above.

Scope of work

Architecture, masterplanning and landscape for a ready-made garment factory. Alif Group RMG Factory, TO CONFIRM.